Thursday, 12 March 2015

Friday 6th March - New Build Images by Emma Wilde

                      Luke on site
                               Front view of the building
                               Luke and Liam on site
                                             Side view of the building

                                Liam and Luke on site

                                Builders at work

                               Builders at work
                                           View of all the floors of the building

                                Walkways

                                             Builders operating a crane
                                What is going to be the front entrance to the building

Friday, 6 March 2015

Friday 6th March by Luke Jackson


First floor view (3)
First floor view (2)
First floor view (1)

side view of the whole building 
Andy and Liam on ground level
Andy showing us around the site

The top floor walkways
The front area of the building
On the top floor looking at the front end of the building 
Liam on site
View from the top floor  

Looking up from the first floor
Liam and Emma on site
View of what is to be the front of the building


Looking down on all the floors

Friday, 27 February 2015

13th of Feb by Liam Ratcliffe

Work being done on the ground


The floor being done
Part of the floor filled in and drying on the first floor

The top floor

Looking around the top floor

Being built up

Tam on site


Friday, 13 February 2015

Friday 13th February 2015: Laying Concrete

K Linnane

K Linnane

K Linnane

K Linnane

Tamenay & Liam on Site

T Sheikh

T Sheikh

T Sheikh

T Sheikh

T Sheikh

T Sheikh

Liam on site

 T Sheikh

T Sheikh

T Sheikh

T Sheikh

T Sheikh

T Sheikh